🚧 Road Maintenance Notice 🚧

Shoulder pull work has commenced on the Piapot Grid between Highway No. 6 and Ravenswood Road (RR 2191).

✅ The road remains open to traffic.

Please watch for signage, reduce your speed, and use caution when passing workers and equipment.

Thank you for your patience and cooperation! 🚜🚗 #RoadMaintenance #SlowDownMoveOver

 


🚧 Grid 734 Road Closure & Detour Notice 🚧


Please be advised that work on the bridge-to-culvert replacement project on Grid 734, approximately 1.5 miles west of Highway No. 11 – Exit A, will resume on June 1, 2026.

Contractors will be onsite completing earthwork and final road surface improvements, which will require the temporary closure of this section of road. The closure is anticipated to remain in place for approximately three weeks.

Motorists are asked to follow all posted detour and construction signage along Highway No. 11 and Grid 734. We appreciate your patience and cooperation during this project.

 

 

 

Rge Rd. 2211  - Closed from Grid 734 to Twp Rd. 192

UPDATE: April 7, 2026 - Now Open

Closed until further notice, due to water conditions.

 

Grid 734 (west of Hwy 11-Exit A) - BRIDGE REPLACEMENT

Dec.23/25 UPDATE: Grid 734 west of Hwy 11-Exit A is now open, with reduced speeds.


 

ASL Road - RR2225 - PARTIAL CLOSURE

Mar.12/26 UPDATE: ASL Road, located on Range Road 2225, between the Valleyside Road and Highway No. 11, is now open. 


Pense Grid No. 641 & Trestle Bridge RR2221 - BRIDGE WEIGHT RESTRICTION

Please be advised that the bridge located on the Pense Grid (Grid 641), between Seven Bridges Road (Range Road 2215) and Range Road 2221, has been reduced to 20 tonnes GVW. Please use an alternate route. This weight reduction has been established at the recommendation of engineers and is temporary. We expect repairs to take place in September, at which time the bridge weight can be restored.

Also, please be advised that the Trestle Bridge, located on Range Road 2221, between the Pense Grid (Grid 641) and Highway No. 11, has been reduced to 20 Tonnes GVW. Please use an alternate route. This weight reduction has been established at the recommendation of engineers and is temporary. We expect repairs to take place in September, at which time the bridge weight can be restored.